Complete Finishing
From the first infrastructure works to the final furnishing stage, with a full specification for every item.
We start with you at the infrastructure stage and carry the finishing through to the very last furnishing stage. Every stage has a complete specification defining the material, its type, grade and installation method.
Written, approved specifications before execution: material type, brand, grade and code. What we agree on is exactly what gets built.
- Infrastructure: electrical, plumbing, HVAC and drainage
- Finishing: plastering, flooring, gypsum board, painting
- Doors, windows and facades
- An approved specification for every item
- From the first pipe in the wall to the last decorative touch